Cable monitoring - A key enabler of extra long DC cables
Date: 05.05.2021
Time: 2 pm CEST - 8 am EST - 8 pm SGT

On-site testing of extra long cables was a topic of the HIGHVOLT Web Talk 2020, experiencing an overwhelming participation. We want to follow this up with the possibilities for monitoring DC cables. Having successfully commissioned an extra long DC cable might be a major milestone and the start of another phase in the lifecycle. How can we guarantee the availability and the reliability of the cable system? Therefore, we like to learn from a pioneer in extruded DC cables about the technological complexity and boundary conditions of the operational service. Another question of interest is the technical requirements of measuring PD on DC cables. Having measured PDs leads to the next point: How to analyse and interpret these measurements?
 |
Marc Jeroense
Owner and Expert
MarCable Consulting
|
|
 |
Prof. Markus H. Zink
Leader of the Institut for Electrical Power Engineering and High Voltage Technology (IEHT)
University of Applied Sciences Würzburg-Schweinfurt
|
|
 |
Erik Winkelmann
Supervisor Monitoring Systems
HIGHVOLT Prüftechnik Dresden GmbH
|
|
 |
Moderation: Florian Schwarz
|